Renovations to existing classroom spaces including two flat floor classrooms, three tiered classrooms, one sloped classroom, and an auditorium. In addition to the new finishes and lighting, a large AV package and fixed seating / furniture was required for the space. Coordination with the design team prior to construction was instrumental in securing long lead-time items to ensure completion within the tight summer schedule.